How we work




Our solutions are WIN WIN solutions!




Only by cooperating can the desired results be achieved, but cooperation works and therefore exists only when the interests of the parties coincide.

Therefore at Chemical Empowering we have understood that selling what we produce may seem like an economic success but in reality represents a moral failure because everything does not end when the machinery is delivered: that is the starting point!

Every machine has a useful life. Normally upon purchase there is 100% efficiency and then it gradually decreases over the years until complete decay and the need to replace the machinery itself.

This useful life, today more than ever, can be extended at least efficiently with simple measures:

  • scrupulous maintenance;
  • the constant updating of the software used;
  • the replacement, if necessary, of some functional modules.

With a traditional economy made up of a seller and a buyer, the latter could often consider an update superfluous or could be oriented towards saving and cutting back on some maintenance or could even consider some module updates superfluous.

With an economy based on cooperation and, therefore, with the achievement of a total overlap of the interests of the parties, however, it will be in the common interest to push to the maximum and maintain the machinery as best as possible by updating it as soon as this becomes necessary.

This can be achieved by establishing a joint venture owned by both Chemical Empowering and the person who would previously have been classified as the "customer".

Furthermore, all this represents a significantly lower cost for the "customer" than in the past.

All this does not have elements of comparison in any part of the world and is among the so-called WIN WIN solutions.

Contact us and let's discuss it!

what

7 days +/-
Contract verification and signature
120 days (up to)
Drafting of the project - feasibility study
60 days (up to)
Fund due diligence
90 days +/-
Engineering
180 days (up to)
Construction
60 days (up to)
Factory assembly
14 days +/-
Pre-Testing and ready to ship
180 days (up to)
Testing and commisioning

Detail Design

5%

At the start of construction

30%

At the start of assembly

20%

After passing the pre-test

15%

To the notice of ready to ship

10%

Upon passing the final test

20%

CE ECO EN

We are including articles, graphics and brochures on the site that can also be downloaded in French, Italian, Spanish and Portuguese.

During insertion, some pages will be temporarily unreachable.

We apologize for the inconvenience.

CE ECO FR

Nous sommes en train d'insérer sur le site des articles, des graphiques et des brochures qui peuvent également être téléchargés en français, italien, espagnol et portugais.

Lors de l'insertion, certaines pages seront temporairement inaccessibles.

Nous nous excusons pour le dérangement.

CE ECO IT

Stiamo inserendo nel sito gli articoli, le grafiche ed i depliant scaricabili anche in francese, italiano, spagnolo e portoghese.

Durante l'inserimento alcune pagine saranno temporaneamente non raggiungibili.

Ci scusiamo per il disagio.

CE ECO PT

Estamos em processo de inserção de artigos, gráficos e brochuras no site que também podem ser baixados em francês, italiano, espanhol e português.

Durante a inserção, algumas páginas ficarão temporariamente inacessíveis.

Pedimos desculpas pela inconveniência.

CE ECO ES

Estamos en proceso de inserción de artículos, gráficos y folletos en el sitio que también se pueden descargar en francés, italiano, español y portugués.

Durante la inserción, algunas páginas serán temporalmente inaccesibles.

Nos disculpamos por el inconveniente.